The job
A landscape construction crew was building out a site on High Street in Roseworthy, north of Gawler. The work ran for weeks, with machinery and trucks coming and going all day. The street needed to be closed at the work area and traffic slowed on the approaches, every working day, without fail.

The permit
The job ran under a Department for Infrastructure and Transport permit covering slow traffic on High Street, from 7am to 7pm. The traffic guidance scheme set speeds of 25 km/h past the site, with bollards and mesh to separate the work area from traffic.
How the crew ran it
The same crew came back day after day. Each morning they set out the signs, cones and closure before the client's crew started, and packed it all away at the end of the day. Signs were weighted with two or three weights each and, where possible, rested against something fixed like a pole, because a loose sign on an open road is a hazard of its own.


Because our controllers are directly employed, we could keep the same people on the job, so they knew the site, the trucks and the client's routine. On a long project that matters more than people think.
The result
More than ten weekday shifts and still going into November, with the road closed safely every day and traffic kept moving at reduced speed. It has made Roseworthy our busiest location this year.