The job
A crew needed to work beside Mount Barker Road at the Taminga Grove corner in Verdun, between Stirling and Hahndorf. Doing it late at night meant far less traffic, but it also meant darkness and drivers who don't expect road works at midnight. The work had a permit and an approved traffic guidance scheme: slow traffic to 40 km/h, and stop/slow with bats while the crew worked.
Turning it around in under three hours
From the booking at 8:20pm, the night was planned out quickly. One controller collected a ute from where it was parked at 10:15pm, with the keys left ready for him, and both controllers were in Verdun for the 11pm start. Each ute carries its own signs, cones and arrow board, so nobody had to load up at the depot first.

Working at night
At night the signs have to do more of the work. The crew set them up to the scheme, with reflective signs and lit arrow boards so drivers could see the change in speed well before they reached the controllers. With the bats, the controllers held traffic and let it through in turns past the work area.
The result
The work was done and both dockets were signed off by the client's site representative before midnight. Then the signs came in and the road was back to normal.
We work across the Hills often. See our pages for Stirling, Verdun and the Adelaide Hills.