INSTAQUIPT
Road works on Redbanks Road, Gawler Belt

Home  /  Job stories  /  Gawler Belt

Job story · Gawler Belt, South Australia

An urgent four-crew callout on a 100 km/h road at Gawler Belt

At 7:41am on Monday 6 October 2026 the phone rang: four traffic controllers and four traffic utes needed at Redbanks Road and Kentish Road, Gawler Belt, straight away.

The call

Redbanks Road is a rural road west of Gawler, signed at 100 km/h, running between paddocks towards Mallala. Road works at the Kentish Road intersection needed traffic control that morning, and the job needed four controllers, each with a traffic ute.

Getting four crews moving

To save time, the crew split up. One controller headed straight to site. Two picked up utes on the way, one of them from the Wingfield yard. The fourth sorted a vehicle with the office. Splitting the pick-ups meant nobody had to drive to Wingfield first and then back out past Gawler.

Road works with cones and traffic control at the Kentish Road intersection on Redbanks Road, Gawler Belt
Looking along Redbanks Road towards the work area at Kentish Road.

Bringing a 100 km/h road down to walking pace

On a road this fast, drivers need plenty of warning. The crew set the approaches up to the approved traffic guidance scheme and permit, stepping the speed down in stages, from 100 to 80, then 60, then a 40 km/h Prepare to Stop sign ahead of the work. Portable traffic signals ran the shuttle past the work area, with the controllers watching each end, managing the queues and keeping the signs and cones in place.

40 km/h Prepare to Stop sign on the shoulder of Redbanks Road, Gawler Belt
The last warning before the signals: 40 km/h, Prepare to Stop.

A long day

It turned into a long day. The crew stayed through the afternoon and into the evening, with the last docket signed off after 8pm, then packed the signs away.

Why it matters

Urgent work doesn't wait for a booking form. Because our controllers are employed directly and our utes are kept stocked, we can put a full crew on a high-speed road within hours of a phone call. We have been back in the area since, running three weeks of road closures at Roseworthy, just up the road.

Need traffic control nearby? See our Gawler page or our work across northern Adelaide.

Get in touch

Tell us what you need and when.

Crews, vehicles or a traffic plan — send the details through and we will come back to you with a price. For anything urgent, call.

Depot73 South Tce, Wingfield SA 5013
Hours24/7 callout · after-hours, night and weekend shifts

We will reply by email. For anything urgent, call 0424 325 115.